Utility-Scale PV Installation Partner
Complete field execution for ground-mounted photovoltaic power plants.


Who we are?
Edimo is a photovoltaic installation partner with experience since 2010,
own technical background and installation capacity for larger solar projects.
What we can deliver
We provide complete field execution for utility-scale photovoltaic projects — from site preparation to transformer station connection.

Site preparation and land adjustment

Fencing and site infrastructure

Pile driving
& ramming

Mounting structure installation

PV module installation

DC string
cabling

AC
cabling

Inverter
installation

Connection to transformer station

Testing and handover support
Why partner
with Edimo?
with Edimo?
We help reduce coordination complexity by covering multiple installation phases under one cooperation model.
- Fewer interfaces
- Better coordination
- Reliable execution
- Hardware support


Powering the next generation of energy infrastructure
Battery Energy Storage Systems (BESS) are becoming an essential part of modern energy infrastructure. We provide scalable storage solutions designed to work alongside solar generation and support more flexible, efficient and reliable energy management.
References
BROSE – 13,98 MWp
50 MWh battery storage concept. (Featuring 30x Huawei LUNA2000-4472-2S Smart String Grid Forming ESS). Starting as a large-scale solar installation, now expanding into a comprehensive energy concept to maximize self-consumption and energy independence.
Nordhausen – 29,3 MWp
Thuringia, central Germany
From zero to test lamp verification in 1 month (Executed in partner cooperation with Glowway)
Stedesand – 32 MWp
Schleswig-Holstein, northern Germany
From zero to fully operational — complete turnkey build in 4 months (Executed in partner cooperation with Glowway)
Mosel Cluster – 62,5 MWp
Moselle region — southwest Germany
Our largest cluster 5 parks right next to each other (Executed in partner cooperation with Glowway)
Stendal – 15.9 MWp
Saxony-Anhalt, eastern Germany
From zero to test lamp verification in just 4 weeks (Executed in partner cooperation with Glowway)
Utility-Scale Segment
More References from installations in Germany
Schweiz
Deutschland
Österreich
Rumänien
Slovensko
Česko















